You don't have javascript enabled. Good luck with that.
Pencarian
112 Titik Sheet Pile Bolong di Kali Moonkervart dan Kali Angke Ditambal

Kali Mookervart River Sheet Piles in Five Urban Villages Patched

The West Jakarta Water Resources (SDA) Sub-agency personnel have started patching the perforated sheet pile walls of Kali Mookervart River in five urban villages.

It has been ongoing since a week and is targeted to be complete in the upcoming April

Drainage Maintenance Division Head Wawan Kurniawan disclosed, those five urban villages were Kedoya Utara Urban Village (Kebon Jeruk), Rawa Buaya Urban Village (Cengkareng), Kedaung Kali Angke Urban Village (Cengkareng), Wijaya Kusuma Urban Village (Grogol Petamburan) and Jelambar Baru Urban Village (Grogol Petamburan).

"It has been ongoing since a week and is targeted to be complete in the upcoming April," he expressed, Friday (3/19).

Nine Cubic Waste Transported from Mookervart River

Based on the temporary data, around 112 points of sheet piles were in perforated or leaking conditions. To repair it, as many as 100 personnel had been alerted to the location.

"Hopefully the river can optimally accommodate the water in large quantities in order to minimize flooding," he hoped.

Linked News
Popular News indeks
  1. Transjabodetabek PIK 2-Blok M Route Serves 1.4 Million Passengers

    access_time24-05-2026 remove_red_eye1840 personAldi Geri Lumban Tobing
  2. Kultura Market in Pademangan Barat Attracts Crowds

    access_time22-05-2026 remove_red_eye1122 personAnita Karyati
  3. West Jakarta to Host Career Day Walk-in Interviews Next Week

    access_time21-05-2026 remove_red_eye1087 personBudhi Firmansyah Surapati
  4. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye879 personNurito
  5. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye712 personAldi Geri Lumban Tobing